Responsibility for Inspection - Unless otherwise specified in the contract or
purchase order, the supplier is responsible for the performance of all inspection requirements as
specified herein. Except as otherwise specified, the supplier may utilize his own facilities or any
commercial laboratory acceptable to the Government. The Government reserves the right to per-
form any of the inspections set forth in the specification where such inspections are deemed nec-
essary to assure supplies and services conform to prescribed requirements.
Classification of Tests - Items covered by this specification shall be subjected
4.1.1
to the following tests to determine compliance with all applicable requirements:
(1) Preproduction Tests
(2) Production Sample Tests
(3) Acceptance Tests
Preproduction Tests - Preproduction tests shall be made on an equipment repre-
4.2
sentative of the production equipments to be supplied under the contract. Preproduction tests
shall consist of the following:
(1) Contractor Demonstration Tests
(2) Service Approval Tests
4.2.1
Contractor Demonstration Tests - Contractor demonstration tests shall be ac-
complished under the responsibility of the contractor and shall be conducted in accordance with
the approved test procedure of 4.5. The government inspector and the procuring activity shall be
advised when tests are to be conducted so that a representative may be designated to witness or
supervise the tests when so desired. Contractors not having adequate facilities to conduct all re-
quired tests shall obtain the services of a commercial testing laboratory.
4.2.1.1 Demonstration Test Data - The contractor shall submit all data collected in con-
ducting these tests to the procuring agency for review and approval.
Service Approval Tests - At the completion of the contractor demonstration tests
4.2.2
and when requested by the procuring activity, the equipment shall be delivered at the contractor's
expense to a specified government laboratory for additional testing. This additional testing may
consist of duplicating tests previously conducted and such other tests as are deemed necessary to
determine compliance with all applicable design and performance requirements,
4.2.2.1 Accessory Material - In addition to the complete equipment submitted for ser-
vice approval tests the contractor shall also submit the accessory material and design and test
data specified in Specification MIL-T-21200. This reformation shall indicate the physical and elec-
trical characteristics of the equipment and establish the equipment's compliance with applicable
requirements.
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business