MIL-S-49442 (ER)
(1) Quality conformance inspection of equipment
before packaging (See 4.5)
(2) Quality conformance inspection of packaging
(See 4.4).
First Article inspection.
First Article inspection shall be performed
4.3
by the contractor and witnessed by the Government Representative unless otherwise
specified in the contract.
It shall consist of the First Article inspection
specified in Table 1, the inspection specified in the subsidiary documents
covering the items listed in 4.4 and the inspection specified for group A, group
B and group C (See Table II, III and IV respectively).
First Article data. The First Article test plan and test report (s)
4.3.1
shall be as required in the contract or purchase order.
TABLE I FIRST ARTICLE INSPECTION
The following
Acceptance inspection covered by subsidiary documents.
4.4
shall be inspected under the applicable subsidiary documents as part of the
inspection of equipment before packaging:
a) In Specification MIL-P-11268:
Where Required
Items
General requirements for plastic material
3.20
and plastic parts
3.20
Wiring and Cabling, including
Slack
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business